haibao robot combines complementary cutting and welding stations into a pressure-vessel production route. The reference application at Wuxi Baiante brings together P+T welding equipment, a half-pipe automatic welder and a head-opening robot.
Pressure vessel production equipment reference |
Welding automation at the Baiante application site |
Integrated equipment in the customer workshop |
Vessel fabrication equipment arrangement |
Pressure vessel manufacturing application |
Cutting and welding equipment reference |
Reactor production equipment at the customer site |
haibao robot · PRESSURE VESSEL PRODUCTION EQUIPMENT
haibao robot combines complementary cutting and welding stations into a pressure-vessel production route. The reference application at Wuxi Baiante brings together P+T welding equipment, a half-pipe automatic welder and a head-opening robot.
The plasma–TIG module addresses suitable shell or plate joints. The half-pipe welding module follows jacket seams around the vessel. The head-opening robot prepares nozzle interfaces on curved heads. Selecting these modules together helps align cutting, fit-up and welding requirements.
A line proposal begins with vessel diameter and length, head profiles, materials, wall thicknesses and nozzle patterns. Product mix matters as much as annual volume: a factory making many variants needs fixtures, programs and changeovers that fit its actual order pattern.
Workpiece supports, lifting and transfer routes, waiting areas and inspection points must be included in the layout. Capacity should be checked at each operation so that improving one process does not simply move the bottleneck to the next station. Utility supplies and maintenance access are also confirmed during layout review.
Develop the process route, review the equipment interfaces, run representative cutting and welding trials, then confirm the layout and acceptance plan. Factory checks and on-site commissioning should verify both individual equipment performance and the agreed workpiece flow. Operators receive training for the supplied configuration.
| Core modules | P+T welding, half-pipe jacket welding, robotic head opening |
| Reference installation | Wuxi Baiante |
| Workpieces | Reactor shells, vessel heads and jacketed vessels |
| Line capacity | Calculated from product mix and complete process times |
| Layout | Customized to workshop, lifting access and material flow |
| Project input | Drawings, process route, inspection needs and output target |
Send a workshop plan and representative vessel drawings, plus annual volume, product mix and current operation times. We will prepare a modular line concept and identify the first process trials.
haibao robot
Shao Yicheng · Key Account Project Director · International Welding Engineer (IWE)
Email: masterhyper@163.com
Phone / WhatsApp: +86 177 5158 3908
Office: +86 519 8837 0688
Explore welding and cutting equipment · Read more application stories
Contact: Mr.Shao
Phone: 0086-17751583908
E-mail: 691043690@qq.com
Whatsapp:86-17751583908
Add: shanghai, China TianHe District, GuangZhou Num 899
We chat