Jingjin Twin-Torch Half-Pipe TIG Welding | haibao robot

Equipment and application images

Reactor shell on turning rolls beneath the half-pipe welding head

Reactor shell on turning rolls beneath the half-pipe welding head

Twin-torch welding system with column, boom and travel rail

Twin-torch welding system with column, boom and travel rail

Helical half-pipe jacket welds on the reactor shell

Helical half-pipe jacket welds on the reactor shell

Close-up of a half-pipe-to-shell fillet weld

Close-up of a half-pipe-to-shell fillet weld

haibao robot · NEWS & TECHNICAL INSIGHTS

Twin-Torch TIG Welding for Jingjin Reactor Half-Pipe Jackets

haibao robot delivered a half-pipe jacket welding system to Jingjin Equipment in Shandong. The system combines twin TIG torches, laser seam tracking and heavy-duty turning rolls for long helical fillet welds on stainless steel reactor shells.

Long seams and changing surface geometry

A half-pipe jacket follows a helical path around the vessel. Rotation and axial torch movement must remain coordinated over the entire seam. Thin stainless half-pipe walls also require controlled heat input and appropriate gas shielding to manage distortion and surface oxidation.

The delivered equipment concept

A column-and-boom welding unit carries the two torches, while turning rolls rotate the shell. Tracking sensors detect seam position, and a pressure-roller arrangement supports fit-up between half-pipe and shell. Stored recipes organize settings by diameter, half-pipe size and material.

Workpiece range and configuration

The source describes a configurable system for 700–3,000 mm shell diameters and lengths up to 6,000 mm, with half-pipe sizes including 76, 89 and 108 mm. These figures describe the reported equipment family; load capacity, travel and process options are confirmed in the project technical agreement.

Reported result and acceptance context

For the reported 6 m reactor application, the source gives a reduction from 3–5 days of manual work to 8–12 hours and a 99.8% first-pass inspection result. These are customer-project figures with a particular workpiece and inspection basis, not universal performance guarantees. New proposals require representative trials and agreed acceptance criteria.

Discuss your application

Send shell and half-pipe drawings, material grades, wall thicknesses, fit-up tolerances, inspection requirements and target output. Ask us to review torch arrangement, tracking and a realistic full-cycle estimate.

haibao robot
Shao Yicheng · Key Account Project Director · International Welding Engineer (IWE)
Email: masterhyper@163.com
Phone / WhatsApp: +86 177 5158 3908
Office: +86 519 8837 0688

Explore welding and cutting equipment · Read more application stories

Categories

Contact Us

Contact: Mr.Shao

Phone: 0086-17751583908

E-mail: 691043690@qq.com

Whatsapp:86-17751583908

Add: shanghai, China TianHe District, GuangZhou Num 899