Welcome: Shanghai Blackhorse Industrial Technology Co. , Ltd.

Parking Structure Welding Robot Cell

The haibao robot parking structure welding cell combines robotic welding with dedicated fixtures and workpiece positioning. The Shanghai Cibao reference application uses a dual-station arrangement for components of mechanical parking systems.

EMAIL

Equipment and application images

Dual-station robot welding cell for parking-system parts

Dual-station robot welding cell for parking-system parts

Robots and part-positioning fixtures

Robots and part-positioning fixtures

Fabricated parking-system component

Fabricated parking-system component

Welded structural component detail

Welded structural component detail

haibao robot · Robotic welding cells

Dual-station welding for parking-system steel components

The haibao robot parking structure welding cell combines robotic welding with dedicated fixtures and workpiece positioning. The Shanghai Cibao reference application uses a dual-station arrangement for components of mechanical parking systems.

Manual loading with automatic robot welding

Operators load and unload the components and locate them in the tooling. The robot then follows the program for the selected part. The reference layout uses pneumatic turning positioners to present the joints for welding.

Separate the fixture and program for each part

Different components use appropriate tooling and corresponding welding programs. A defined changeover process helps operators select the correct fixture and program when moving between products.

Expand around a known component family

The reference design describes the ability to introduce additional products by adding suitable fixtures. A new part still requires an assessment of reach, weld access, clamping and the safe operating sequence before it is included in production.

What should the buyer provide?

Send drawings of the beams, rails or other parking-system components, including weld symbols and tolerances. The machine proposal should state the loading method, station layout, positioning scope and model-changeover requirements.

Configuration reference

Reference customerShanghai Cibao
ApplicationMechanical parking-system steel components
Station arrangementDual station
Loading and unloadingManual
PositioningPneumatic turning positioners in the reference layout
WeldingAutomatic robot cycle with part-specific programs
Robot model and capacitySelected for the proposed components

Discuss your application

Send component drawings, weld specifications, part size and weight, product mix and required output. Ask for a dual-station welding-cell layout and fixture-changeover proposal.

haibao robot
Shao Yicheng · Key Account Project Director · International Welding Engineer (IWE)
Email: masterhyper@163.com
Phone / WhatsApp: +86 177 5158 3908
Office: +86 519 8837 0688

Explore welding and cutting equipment · Read more application stories

INQUIRY