Welcome: Shanghai Blackhorse Industrial Technology Co. , Ltd.

News

Reactor Jacket Welding at Zhongfu | haibao robot

Equipment and application images

Twin-torch jacket welding on the Zhongfu reactor shell

Twin-torch jacket welding on the Zhongfu reactor shell

Close-up of the opposed half-pipe welding torches

Close-up of the opposed half-pipe welding torches

Welding head and turning rolls during operation

Welding head and turning rolls during operation

Half-pipe jacket welding detail at the customer site

Half-pipe jacket welding detail at the customer site

haibao robot · NEWS & TECHNICAL INSIGHTS

Twin-Torch Reactor Jacket Welding Delivered to Shandong Zhongfu

haibao robot delivered and commissioned a half-pipe jacket welding station for Shandong Zhongfu Environmental Technology. The installation welds the two sides of a half-pipe jacket on a reactor shell using coordinated rotation, torch movement and seam tracking.

A 3,200 mm reactor application

The project photographs show a 3,200 mm diameter reactor shell supported on turning rolls. Long helical jacket seams require consistent torch orientation and travel speed while controlling heat input into the shell and the thinner half-pipe wall.

Two torches, coordinated motion

The twin torches are arranged on opposite sides of the half-pipe. Their angles and heights can be adjusted individually, while the welding head, turning rolls and positioning equipment work as a coordinated system. Symmetrical sequencing helps manage heat distribution; it does not eliminate the need to control distortion.

Tracking and repeatable recipes

Laser tracking or mechanical following is selected to suit the application. Stored recipes organize the welding settings by part specification. The source lists typical station options for 800–5,000 mm shells and 25–114 mm half-pipe diameters with 2–6 mm walls; these are configurable ranges, not the dimensions of every delivered machine.

Commissioning and project feedback

Delivery included installation, process calibration and operator training. The project report records approximately 3.2 times the previous welding efficiency, over 99% first-pass inspection acceptance and a 45-day manufacturing-to-production period. These are project-reported results; acceptance targets and schedules for new equipment are agreed for the actual workpieces.

Discuss your application

Send shell diameter and length, half-pipe dimensions, material, joint details, inspection requirements and output targets. We will review the welding process, tracking method and machine arrangement.

haibao robot
Shao Yicheng · Key Account Project Director · International Welding Engineer (IWE)
Email: masterhyper@163.com
Phone / WhatsApp: +86 177 5158 3908
Office: +86 519 8837 0688

Explore welding and cutting equipment · Read more application stories

Categories

Contact Us

Contact: Mr.Shao

Phone: 0086-17751583908

E-mail: 691043690@qq.com

Whatsapp:86-17751583908

Add: shanghai, China TianHe District, GuangZhou Num 899