



A reliable boiler fabrication process depends on many individual joints. The Zhejiang Liju project materials show pipe flange welding equipment, related welding stations and close-up weld photographs. The focus here is the welding operation within thermal equipment manufacturing.
The project photographs show a robot with workholding and rotary positioning equipment. Locating the pipe and flange consistently gives the programmed welding path a repeatable starting point. Pipe diameter, flange face position, joint gap and tack welds should be checked before the cycle begins.
The image set also includes a longer-workpiece station and weld details. Circumferential joints and long seams require different approaches to support, torch access and heat control. For a similar application, start and stop positions, overlap and dimensional changes should be assessed on representative parts.
Send haibao robot your pipe diameters, flange drawings, material grades, thicknesses and required output. The team can discuss robot reach, positioning and fixture requirements around the actual joints.
Contact: Mr.Shao
Phone: 0086-17751583908
E-mail: 691043690@qq.com
Whatsapp:86-17751583908
Add: shanghai, China TianHe District, GuangZhou Num 899
We chat